McDonough Storage

McDonough, GA

Project: McDonough Storage

\nThe McDonough Storage project encompassed a wide range of site development activities. We began by demolishing an existing single-family home and clearing 3 acres of trees to prepare the site. Our team then proceeded with grading and utility installation for a three-story storage building on Jonesboro Road in McDonough, GA. The project also involved significant DOT right-of-way work, which included installing a portion of the storm system and grading a deceleration lane and sidewalks. On-site, we installed storm and sewer facilities, featuring an underground pond. Additionally, we implemented a domestic and fire water system, which required a challenging 120-foot bore under Jonesboro Road. This comprehensive site development project effectively prepared the location for the construction of a modern storage facility while addressing local infrastructure requirements.

Additional Projects

Fulton Science Academy

Fulton Science Academy

Alpharetta, GA: T.W. Brown served as the Full-Service Site Development Contractor for the Fulton Science Academy Sports Complex. Our work included site preparation, grading, and utility installation.

Woodland Grove

Woodland Grove

Tucker, GA: Completed site work for a 35-unit townhome complex, including grading, a 27,000 CY dirt shift, a retention pond, and utilities (storm, sewer with lift station, water).

Tranquility

Tranquility

Decatur, GA: 11.5-acre multi-family complex: Site work for 8 buildings. Full utility installation including sewer, storm, domestic water, and fire line.