Sharpsburg Storage

Sharpsburg, GA

Project: Sharpsburg Storage

\nThe Sharpsburg Storage project showcased our expertise in managing complex site conditions while adhering to environmental considerations. This development encompassed an 8-acre site, of which we carefully disturbed 4 acres for construction purposes. The project’s unique challenge lay in its location adjacent to a residential pond and the presence of an active stream running through the site. Our team demonstrated exceptional environmental stewardship and technical skill by successfully diverting and managing this waterway throughout the entire grading and utility installation process. This delicate balance required meticulous planning and execution to ensure the protection of the existing ecosystem while meeting the development needs of the storage facility. Our comprehensive approach included precise grading operations and the strategic installation of utilities, all while maintaining careful control over the diverted stream. By successfully navigating these challenging site conditions, we not only prepared the ground for the Sharpsburg Storage facility but also showcased our ability to handle environmentally sensitive projects with the utmost care and professionalism.

Included removal of roughly 3500 Cy of Topsoil
Clearing of the whole site
Import and placement of 1000 CY of suitable Fill
11000 CY of Cut/Fill to establish proper grade onsite
Installation of 800 LF of RCP Storm
Installation of fire vault and FDC
Installation of 1040 LF of HDPE Storm Drainage
Installation of 200 LF of 1” Copper Domestic Water Line
Installation of 320 LF of 8” DIP fire line including wet tap and fire hydrant

Additional Projects

McDonough Storage

McDonough Storage

McDonough, GA: 3-acre site prep for 3-story storage. Demo home, clear trees. DOT work, utilities, underground pond. 120′ water bore under Jonesboro Rd.

Fulton Science Academy

Fulton Science Academy

Alpharetta, GA: T.W. Brown served as the Full-Service Site Development Contractor for the Fulton Science Academy Sports Complex. Our work included site preparation, grading, and utility installation.

Woodland Grove

Woodland Grove

Tucker, GA: Completed site work for a 35-unit townhome complex, including grading, a 27,000 CY dirt shift, a retention pond, and utilities (storm, sewer with lift station, water).