Sharpsburg Storage

Sharpsburg, GA

Project: Sharpsburg Storage

\nThe Sharpsburg Storage project showcased our expertise in managing complex site conditions while adhering to environmental considerations. This development encompassed an 8-acre site, of which we carefully disturbed 4 acres for construction purposes. The project’s unique challenge lay in its location adjacent to a residential pond and the presence of an active stream running through the site. Our team demonstrated exceptional environmental stewardship and technical skill by successfully diverting and managing this waterway throughout the entire grading and utility installation process. This delicate balance required meticulous planning and execution to ensure the protection of the existing ecosystem while meeting the development needs of the storage facility. Our comprehensive approach included precise grading operations and the strategic installation of utilities, all while maintaining careful control over the diverted stream. By successfully navigating these challenging site conditions, we not only prepared the ground for the Sharpsburg Storage facility but also showcased our ability to handle environmentally sensitive projects with the utmost care and professionalism.

Included removal of roughly 3500 Cy of Topsoil
Clearing of the whole site
Import and placement of 1000 CY of suitable Fill
11000 CY of Cut/Fill to establish proper grade onsite
Installation of 800 LF of RCP Storm
Installation of fire vault and FDC
Installation of 1040 LF of HDPE Storm Drainage
Installation of 200 LF of 1” Copper Domestic Water Line
Installation of 320 LF of 8” DIP fire line including wet tap and fire hydrant

Additional Projects

Jimmy Carter

Jimmy Carter

Norcross, GA: Storage facility site prep. 1500 CY import, 5500 CY cut/fill. Full utilities: fire line, water, sewer, storm. Grading for building, parking, DOT entrance.

Gwinnett One Stop

Gwinnett One Stop

Snellville, GA: Site development for new community center. Demolition, grading, utilities, stormwater management, and infrastructure for 11-acre site.

Ashley Park

Ashley Park

Newnan, GA: Busy shopping center expansion. Grading for buildings & parking. Water services, sewer with 6 grease traps & 42 cleanouts installed.